About ETCO Engineering

Power that never stops.
Thirty years of engineering excellence.

Since 1996, ETCO has delivered the largest power projects in Palestine for banks, hospitals, telecom operators, and government ministries. We hold the country’s largest stock of generators and UPS systems, supported by a team of more than 50 engineers and technicians.

The power systems we cover: silent generators, UPS, batteries, hybrid inverters, and solar panels
National grid and emergency centre

1996

Established in Palestine

+1,500 MVA

Installed generation capacity

+20

24/7 mobile emergency vehicle

Tier III

Certified international standards

We exclusively represent seven global brands in Palestine. Select one to see what we supply from them.

PowerLink UK and Perkins generators from 10 kVA to 4,700 kVA with superior European silent specifications.
PowerLink UK
Deep Sea DSE
DEYE Solar
Riello UPS
AIKO Solar
Leoch Europe
InfinityPower

What do you need to power?

Select the facility type to view similar projects we have actually implemented, and a preliminary capacity estimate.

Not sure what capacity you need?Calculate it in a minute

Thirty years of electrical engineering in Palestine

From a single project in 1996 to the largest supplier of backup and renewable power in the Palestinian market.

Exclusive authorized agencies

Authorized agents for PowerLink UK and Perkins, DEYE, AIKO, Riello UPS, Leoch and InfinityPower — with factory warranty and original spare parts.

Resident engineering team

Over 50 specialized engineers and technicians, with mobile emergency vehicles covering all governorates around the clock.

Sensitive national projects

Hospitals, Tier III data centers, telecommunications networks and financial institutions — where power outages are not an option.

Get to know us

Institutions that cannot afford power outages

16Industries we serve
8Diverse sectors
1996Since

Jawwal

Telecommunications72 sites under maintenance contract

Paltel

TelecommunicationsA partnership spanning over 25 years

Ooredoo

Telecommunications30+ generators under a leasing model

Mada Telecommunications

Telecommunications30+ sites with integrated service

Palestine Monetary Authority

National institutions1,400 kVA synchronized

Bank of Palestine

Banks15+ generators across branches

Cairo Amman Bank

Banks20+ branches since 2002

Al-Ahli Bank

BanksTier III data center

Palestine Investment Bank

BanksIntegrated data center

UNRWA

International organizationsHeadquarters and hospitals

Ministry of Health

Government4 × 1,125 kVA

An-Najah University Hospital

Healthcare4,700 kVA

Augusta Victoria Hospital (AVH)

Healthcare2.2 MVA

Birzeit University

Higher EducationMultiple UPS systems

Kadoorie University

Higher Education6 generators with cloud monitoring

Econ Mall

Commercial1.76 MW synchronized
A Record of Achievement and Excellence

Our most prominent national and engineering projects in Palestine

Integrated energy solutions for hospitals, Tier III data centers, commercial complexes, and national grids.

Healthcare sector (2025)

Al-Ahli Bank Data Center - Ramallah

Supply and installation of two 1100kVA PowerLink (UK) WPS1000S silent generators, increasing total capacity to 4,700 kVA, including integrated exhaust and ventilation systems and full BMS integration.

System capacity: 4,700 kVA | NFPA 110 Compliant
Financial and banking sector (2016)

Al-Ahli Bank Data Center - Ramallah

Tier III integrated electromechanical project in partnership with Schneider Electric, featuring 12 server racks, N+1 InRow precision cooling, dual intelligent PDUs per rack, and hot aisle containment.

Tier III Data Center | Schneider ISX Architecture
Humanitarian emergency service (2023)

Augusta Victoria Hospital (AVH) - Jerusalem

Installation and commissioning of 4 PowerLink WPS500S generators with 550 kVA capacity each (exceeding 2.2 MVA total) featuring Perkins engines and Deep Sea DSE8610 MKII synchronization panels, completed under wartime conditions, with fire alarm system integration.

Capacity: 2.2 MVA | 48-hour automatic diesel pumping system
National and financial institutions (2016)

Palestine Monetary Authority - Al-Irsal Complex

Equipping the headquarters with PowerLink (WPS1000S + WPS400S) generators with a total capacity of 1,400 kVA, featuring automatic synchronization, remote monitoring, and BMS integration.

Capacity: 1,400 kVA Synchronized | BMS Integrated
Telecommunications and technology sector (2006-2026)

Jawwal & Paltel telecommunications network

The primary energy partner for over 25 years in the supply and maintenance of generators and UPS systems for offices, data centers, exchanges, and telecommunication towers, with capacities ranging from 15 kVA to 1100 kVA.

150+ telecom sites | 24/7 emergency service contract
Commercial Sector (2022)

Icon Mall - Ramallah

Four PowerLink WPS500S generators with 550 kVA capacity each, operating in full synchronization to provide 1.76 MW, with an automatic diesel refueling system from a 4,000-liter central tank ensuring 48 hours of autonomous operation.

1.76 MW synchronized | NFPA 110 Level 2
View all completed projects
The latest and best-selling models

Leading engineering equipment for 2026

Discover our latest energy technology, specifically designed to withstand the harshest conditions and meet the highest international quality standards.

No products in this category yet.

Load Calculator

Calculate what you actually need, not what you're told

This path does not recognize your motors, so it does not calculate the inrush current—which often determines the generator size. Build the list if you have a pump, elevator, or compressor.

88kVABackup generator
50.0 kWSimultaneous load
71%Load factor
13.5 L/hDiesel consumption
200 LTank
  • The requirement exceeds the 66 kVA size by only 14% — slightly reducing the expansion margin or the simultaneity factor saves a full size.
  • Your site's temperature and altitude are within the set's rating limits (40°C and 1000m), so there is no derating — the size here is determined by the load, not the climate.
  • The service level does not change the size here — generator sizes jump in large increments, and your load falls within the same step. The difference between the two levels lies in the equipment and maintenance contracts, not in the size of the generator.
  • With a 200-liter tank, you will need to refill about 16 times a month. A larger tank or a daily tank with a transfer pump will significantly reduce this.

Indicative result for scoping purposes. Final supply requires a site survey — which we provide for free before any proposal.

Etci AI
مرحباً! أنا Etci، المساعد الهندسي الذكي لشركة ETCO (تأسست 1996). اسألني عن مشاريعنا، مولدات بيركنز، محولات DEYE، أنظمة UPS، ورقم الطوارئ!